Write a method statement

Sequenced steps with PPE, plant and hold points — built once in the library, reused across packs.

5 min read · Last reviewed 18 August 2026

Start in the library

  1. 1

    Open RAMS → Library. Eight starter templates cover common trades — start from the nearest one rather than a blank page.

  2. 2

    Create your statement; it gets its own MS reference for citing in packs and permits.

Write the sequence

  1. 1

    Break the job into ordered steps — the sequence is dense and numbered, the way a supervisor briefs it.

  2. 2

    On each step, record the PPE, plant and trades involved, and mark hold points where work must stop for a check before continuing.

Tip: Write steps for the person doing the work on a wet Tuesday. If a step cannot be done as written, it will not be done as written.

Keep the library working

  • A statement is reusable: one “roof access” statement serves every pack that includes roof access.

  • Editing a library statement does not alter packs already issued — issue freezes what was sent.

About this moduleRAMS & method statementsMethod statements that reference your real risk assessments, an issue gate that refuses an incoherent pack, and briefings that hold up.