Raise and issue a permit

From “we need to do hot work” to an issued permit — with every check the type demands verified at the gate.

7 min read · Last reviewed 18 August 2026

Raise it

  1. 1

    Open Permits and create a new permit; pick the type and the site.

  2. 2

    Describe the work, the location and the validity window — when it may start and when it lapses.

  3. 3

    Work through what the type demands: confirm preconditions, attach the isolation certificate, record the rescue plan, link the risk assessment or RAMS pack.

Record the gas tests

  1. 1

    Enter the readings for each gas the type tests, with the time they were taken.

  2. 2

    Each reading gets its own verdict against the type’s limits, snapshotted onto the permit — the numbers you issued on are the numbers the record keeps.

Note: Stale readings fail the gate. A reading in range at 6am does not authorise entry at noon; the freshness rule is the type’s to set and the gate’s to enforce.

Clear the conflicts, then issue

  1. 1

    If other permits overlap the same place — welding above a confined-space entry — the clash is shown and must be explicitly acknowledged, by a person, on the record.

  2. 2

    The authoriser counter-signs and issues. If anything the type requires is missing, the gate refuses with the reason — fix it and issue again.

Tip: The gate refusing is the system working. Every refusal message names the missing thing; an issued permit means all of them existed at issue time.

Acceptance

  1. 1

    The person doing the work accepts the permit within its validity window — acceptance after the window has lapsed is refused.

  2. 2

    A contractor without an account can be named as acceptor and sign on the issuer’s device, counter-signed by a permit holder — because naming an internal colleague who is not doing the work is legally wrong.

About this modulePermits to workAuthorise high-risk work with the checks that must happen first — and a live board of what is open right now.